What are you planning?
Painting inside, hooks and picture hanging, filling small holes, laying carpet, built-in wardrobes, blinds and curtains.
Set by the Strata Schemes Management Act, section 109.
Kitchens, bathrooms without new waterproofing, timber or hard floors, light fittings, wiring and power points, pipes, non-structural walls, glazing, insulation and hot water.
By-law 21. Hard floors must meet the Building Code’s acoustic standard (by-law 12).
Renovations that lay a new waterproof membrane: tiles, fixtures, plumbing and non-load-bearing walls.
By-law 24. Send the form at least 6 weeks ahead where possible (14 days minimum) and wait for written confirmation.
Installing or replacing a split system: where the indoor and outdoor units go, the pipe and cable runs, and the specifications.
By-law 22. Condensate water must be captured and must not drip onto balconies or common property.
Structural work such as a load-bearing wall, anything that changes the outside (windows, awnings, pergolas), or work that needs council consent.
By-law 23. Needs a special resolution at a general meeting.
A summary only. The registered by-laws are the official version.
How to apply
- Download the application form (PDF) with the button below.
- Fill it in with plans, timing, and your contractor’s licence and insurance ($20 million public liability).
- Sign it and email it to the strata manager (megan.degrandis@clisdells.com.au) at least 6 weeks before work starts where possible. The by-laws require at least 14 days.
- Wait for written approval before you start.
Hours for noisy work
- Weekdays7:30 am to 5:30 pm
- Saturday8 am to 2 pm
- SundayNo noisy work
Tell your neighbours before noisy work starts.